DERİNER HEPP

Deriner Dam and Hydroelectric Power Plant was built on the Çoruh River, 5 km from the bridge on the State Highway that connects Artvin city center to Erzurum city center, within the borders of Artvin in the Eastern Black Sea Region. It has a total installed power of 669.6 MW with its 4 generators, each of which is 167.4 MW, and its annual generation capacity is estimated as 2 billion 117 million 750 thousand kWh.

The construction of Deriner Hydroelectric Power Plant, located in the Çoruh Basin, started in 1998, and its construction was completed in 2013 and started to operate. Deriner Dam and HEPP, the first key dam on the Coruh River, is Turkey's 1st largest dam among double curvature concrete arch dams. The height of Deriner Dam is 249 m, the crest length is 720 m, and the width is basically 55-60 m, on the crest it is planned to be 12-18 m. The storage volume is 1,969 hm³ and the lake area at the maximum water level is 26.4 km².

Deriner İnternetten aldık.jpg

Highlights

YEAR OF CONSTRUCTION

2013

WATER CAPACITY

1969 hm³

INSTALLED POWER

669,6 MW

TURBINE TYPE

Düşey Eksenli Francis

LOCATION

ARTVİN

ANNUAL PRODUCTION

2.117,75 Gwh

NUMBER OF UNITS

4

BODY TYPE

Double Curvature Concrete Belt

BASIN

Çoruh

DERİNER HEPP

Promotion Film

DERİNER HEPP

Media Gallery
Deriner Barajı ve Hidroelektrik Santrali.jpg
Deriner İnternetten aldık.jpg
D70_5140.jpg
D70_5144.jpg
D70_4508.jpg
D70_5173.jpg
D70_5164.jpg
der2 (1).jpg
deriner-1.jpg
deriner-hes.jpg